What you get
A live requirements record for every project.
Feasibility through inspection, every jurisdiction's requirements are mapped, cited, and kept current in one place.

Choose your depth
Start light, go deep, stay current.
Feasibility Report
The basic requirements you need to determine whether a project pencils. Available instantly, so you can validate the proposal while you build it.
Comprehensive Report
Every requirement that applies across design, engineering, permitting, interconnection, and inspection. Generate it instantly, and it stays current for 2 years.
- Deep Research for project-specific conditions and edge cases.
- Stays live for 2 years — refreshed automatically as rules change.
The Data
The data behind every project.
Fordje structures requirements from the 80 to 250+ documents that govern a jurisdiction. Code, local checklists, permit and inspection requirements, utility rules, engineering standards, and contact information.
Every requirement is mapped to the project and cited to its source.
documents per jurisdiction, structured into a single project record.
Change Tracking
Always current. Get ahead.
Always current.
Every data point in a Comprehensive Report stays under watch. When one changes, Fordje alerts you so you find out on your schedule, not the reviewer's.
Get ahead of changes.
We track approved changes on the state and federal level so you can make plans ahead of time.
Plans stay valid because the data stays live.
